Description
Premium Blow Bars for Maximum Impact Crusher Performance
Maximize your tonnage and crush operating costs with our engineered Impact Crusher Blow Bars. Designed to withstand high-velocity impacts and highly abrasive materials, our blow bars are available in High Chrome, Martensitic Steel, and cutting-edge Ceramic Composite (MMC) to ensure extended wear life in recycling, quarrying, and mining applications.
Technical Specifications & Material Options
| Material Type | Best Suited For | Hardness / Features |
| High Chrome (Cr20 / Cr26) | Highly abrasive materials (Granite, Basalt, Asphalt) | HRC60 – HRC65 / Extreme wear resistance |
| Martensitic Steel + Ceramic | Mixed feed (Concrete with rebar, limestone, recycling) | High impact toughness + Ceramic wear insert |
| Martensitic Alloy Steel | Large feed size, high-impact environments | Excellent toughness, resists cracking |
Why Partner With Us For Crusher Wear Parts?
Advanced Ceramic Insertion Technology: Our Ceramic Matrix Composite (MMC) blow bars combine the toughness of steel with the extreme hardness of ceramic, delivering 2 to 3 times the lifespan of standard high-chrome bars.
Perfect Fit Guarantee: 100% interchangeable with major global brands including Hazemag, Kleemann, Metso (Nordberg), Sandvik, Rubble Master, and Terex Finlay.
Solid Casting Quality: Produced via vacuum casting and precise heat treatment to eliminate internal gas holes and micro-cracks, ensuring maximum safety against breakage.
Customized Engineering: We can adjust the chemical composition (Chromium, Molybdenum, Nickel content) and tooth profiles based on your specific rock type and crushing conditions.
Supported Brands & Models (Partial List)
⚠️ Note: Please match your OEM part number or contact our team with your machine model before completing your purchase.
Hazemag Series: APK30, APK40, APK50, APK60, AP-K 1010, AP-K 1313, AP-KV 1515
Kleemann Series: MR110, MR110Z, MR130, MR130Z, MR150
Metso / Nordberg Series: NP1313, NP1415, NP1520, NP1620, NP1110
Rubble Master Series: RM60, RM70, RM80, RM100, RM120
Packaging, Shipping & RFQ
MOQ: 1 Set (2 or 4 pieces depending on the rotor configuration) / 1 Ton.
Packaging: Standard export steel pallets with anti-rust wrapping.
Lead Time: 25-35 days (Custom drawing analysis takes 2-3 business days).
Get a Quote: Send us your OEM Part Number or Drawings today for an instant factory-direct price!




Reviews
There are no reviews yet.